ONGOING-PROJECT


Cadangan membina rangkaian paip pembentungan bagi kawasan Si Rusa, Daerah Port Dickson, Negeri Sembilan Darul Khusus

CLIENT : Suruhanjaya Perkhidmatan Air Negara

Completion Period : 36 Months
Commencement Date : 14th September 2015
Date for Completion : 13th September 2018

Description :
The Works involves sewer extension and rationalization of the existing public sewage treatment plants (STPs) within Si-Rusa sub-catchment which will eventually convey sewage flows to the Si-Rusa Pump Station. The estimated length of the main trunk sewer networkwill be approximately 3,090m and the reticulation sewer will be approximately 6,378m. The total length of sewer pipeline to be laid will be 9,468m.

ONGOING-PROJECT


Rangkaian Paip Pembetungan Di Bayan Baru, Pulau Pinang (Fasa 2) - Pipe Jacking Works.

CLIENT : Jabatan Perkhidmatan Pembetungan Kementerian Tenaga, Teknologi Hijau Dan Air (JPP)

Completion Period : 25 Months
Commencement Date : 16th January 2016
Date for Completion : 15th February 2018

Description :
The scope of works under the contract “Works”, amongst others, shall comprise the followings :-

a) Design and construct jacking Pit
b) Design and construction Receiving Pit
c) Supply and jack in using microtunneling method for pipe size 225mm VCJP, 300mm VCJP, 375mm VCJP, 450mm RCJP, 525mm RCJP, 600mm RCJP, 750mm RCJP, 900mm RCJP, 1050mm RCJP, 1200mm RCJP, 1500mm RCJP and 1800mm RCJP.